Chat with us, powered by LiveChat
877-843-0183

This picture shows the Cabinet Installation. On this location the Floors were unstained concrete with a polymer finish that was applied after the Cabinets set. Typically with Tile floors the Cabinets would be Set after all of the Tile work had been Completed.

Darrin Savage

Comments are closed.